Modular flexibility redefines well-intervention and subsea installation
AXTech and 7ocean Invent are proud to introduce the Smart Tower Solution (STS), a revolutionary advancement in subsea operations designed to meet the rising demands of well-intervention, subsea installation, and future plug and abandonment operations.
-The Smart Tower Solution sets a new standard in modular flexibility, allowing for adaptable configurations tailored to specific tasks and operational requirements. This offers flexibility never seen before in the industry, says Richard Myhre, CEO at AXTech.
The Smart Tower Solution can be installed on any Offshore Construction Vessel (OCV) equipped with offshore cranes that meet specific criteria. This adaptability ensures that the system can be configured to suit various tasks, from Riserless Light Well Intervention (RLWI) operations to retrieving production tubing from wells and subsea module handling. The solution’s modular nature allows for swift mobilization and demobilization of required modules, each designed to be split into "road-ready" sections if necessary.